'); } -->
There is a very serious threat to our fisheries and all marine mammal life looming in the very near future courtesy of PG&E.
For as long as it has existed, the issues surrounding Diablo Canyon nuclear power plant have been complex and the stakes have been high. The production of huge quantities of electrical power, with its enormous economic impact, brings with it difficult discussions on issues such as the handling of high-level nuclear waste and the safety of plant operations in a seismically-active region. We have long wrestled with the costs, benefits and risks of this powerful facility.
After reading about the Blunt family and the malpractice suit they have filed against Dr. Kurt Haupt (Family seeks millions in malpractice lawsuit, April 4), my husband and I felt compelled to write to your paper.
On March 15, the San Luis Obispo County Local Agency Formation Commission (LAFCO) denied the proposed annexation of the 154-acre Los Robles del Mar project into the city of Pismo Beach.